Case Study Beck Manufacturing Discussion

Read the “Beck Manufacturing” case study in Chapter 8 of your text. In a three- to four-page paper, address the following:Calculate the capacity of each machine center and the capacity of the system.
Analyze where the focus of the company’s efforts should be if Beck wants to expand capacity. Determine how much extra capacity he can get without causing another operation to become the bottleneck.
Suggest ways Beck can expand capacity without purchasing new equipment.
Your paper should be in paragraph form (avoid the use of bullet points) and supported with the concepts outlined in your text and additional scholarly sources.

Submit your three- to four-page paper (not including the title and reference pages). Your paper must be formatted according to APA style as outlined in the Ashford Writing Center and must cite at least three scholarly sources in addition to the textbook.

Case Study
Beck Manufacturing

Al Beck, president of Beck manufacturing, wants to determine the capacity of his facility, which produces steering gears for auto manufacturers. He has asked you to sort through the data and determine the capacity of the system and how that capacity may be increased. The operation is a product layout that produces large numbers of nearly identical products. The process includes milling, grinding, boring, drilling, and assembling, in that order. Each finished product requires one operation on each type of machine. For example, each finished part is processed on one of the five milling machines, one of the seven grinding machines, etc.

The facility runs two 8-hour shifts per day, with a third shift for maintenance. The industrial engineering department has provided you with the following data on present operations. In addition, you have been told that assembly operations, while not unlimited, can be easily changed to meet the need.

Operation Number of Machines Run Time per Piece (min.) % Reject Rate
Milling 5 2 3
Grinding 7 3 5
Boring 3 1 2
Drilling 6 2.5 7
Calculate the capacity of each machine center and the capacity of the system.
If Beck wants to expand capacity, where should he focus the company’s efforts? How much extra capacity can he get without causing another operation to become the bottleneck?
How may Mr. Beck expand capacity without purchasing new equipment? Be specific

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Benefits of our college essay writing service

  • 80+ disciplines

    Buy an essay in any subject you find difficult—we’ll have a specialist in it ready

  • 4-hour deadlines

    Ask for help with your most urgent short tasks—we can complete them in 4 hours!

  • Free revision

    Get your paper revised for free if it doesn’t meet your instructions.

  • 24/7 support

    Contact us anytime if you need help with your essay

  • Custom formatting

    APA, MLA, Chicago—we can use any formatting style you need.

  • Plagiarism check

    Get a paper that’s fully original and checked for plagiarism

What the numbers say?

  • 527
    writers active
  • 9.5 out of 10
    current average quality score
  • 98.40%
    of orders delivered on time
error: